A · level
dbt
92.9
14,183 stars · Apache-2.0
Analytics
Too close to call · 92.9 to 93.8
A · level
92.9
14,183 stars · Apache-2.0
B · level
93.8
10,650 stars · MIT
dbt versus uPlot is a Analytics comparison assembled from public repository metrics, the license on file, and whether each product can be self-hosted. dbt is written mainly in Rust; uPlot is written mainly in JavaScript. The composite score is 92.9 for dbt and 93.8 for uPlot.
dbt has 14,183 GitHub stars to uPlot's 10,650, a gap of 3,533 (1.33×). Forks are 2,679 for dbt and 472 for uPlot. On the log scale used inside this pair, adoption is 100 versus 97, and the fork community is 100 versus 78.
Push history: dbt was last pushed on 17 November 2026 (0 days ago), and uPlot was last pushed on 17 November 2026 (0 days ago). Open issues stand at 1,915 for dbt (0.135 per star) and 132 for uPlot (0.012 per star). Issue-health scores are 34 and 84; activity scores are 100 and 100.
dbt is listed as Apache-2.0, which this catalog treats as a permissive grant. A company can usually ship it inside a commercial product and keep its own application code private, provided it keeps the copyright notice. uPlot is listed as MIT, which this catalog treats as a permissive grant. A company can usually ship it inside a commercial product and keep its own application code private, provided it keeps the copyright notice. License scores in this pair are 96 for dbt and 96 for uPlot. This is a procurement signal, not legal advice.
In Analytics, both dbt (14,183 stars) and uPlot (10,650 stars) are marked self-hostable. Deploy scores are 100 and 100. Running either one means you own upgrades, backups, and the license duties that follow a modified copy. Pricing labels on file: dbt is open source, uPlot is open source.
The lead is split. dbt is furthest ahead on fork community (100 to 78), while uPlot is furthest ahead on issue health (84 to 34). Choose the dimension a rollout cannot compromise on.
Composite score: dbt 92.9, uPlot 93.8. The margin is under one point, so this page calls a tie. Use the dimension breakdown rather than the headline number.
Scores are computed inside this pair only. Method and weights.
Bars are scaled within the row. Higher is stronger. Open issues are a raw count, so that row has no bar.
| Signal | dbt | uPlot |
|---|---|---|
| GitHub stars | 14,183 | 10,650 |
| Forks | 2,679 | 472 |
| Open issues | 1,915 | 132 |
| Adoption | 100 | 97 |
| Activity | 100 | 100 |
| Community | 100 | 78 |
| Issue health | 34 | 84 |
| License | 96 | 96 |
| Self-hosting | 100 | 100 |
| Composite | 92.9 | 93.8 |
dbt enables data analysts and engineers to transform their data using the same practices that software engineers use to build applications.
📈 A small, fast chart for time series, lines, areas, ohlc & bars
dbt has more GitHub stars: 14,183 versus 10,650 for uPlot. The gap is 3,533 stars.
Both were last pushed on 17 November 2026.
Yes. This catalog marks both dbt and uPlot as self-hostable. Confirm each project's deploy docs before you plan a migration.
dbt is listed as Apache-2.0, which this catalog treats as a permissive grant. A company can usually ship it inside a commercial product and keep its own application code private, provided it keeps the copyright notice. uPlot is listed as MIT, which this catalog treats as a permissive grant. A company can usually ship it inside a commercial product and keep its own application code private, provided it keeps the copyright notice. Read both grants before you embed either codebase in a hosted product. This is not legal advice.
Neither tool clears a one-point margin. dbt scores 92.9 and uPlot scores 93.8.